Capstone completes UK facility expansion

16 August 2021

Capstone Green Energy Corp. announced the completion of the grid interconnect expansion at its UK Integrated Remanufacturing Facility which allows for the building and testing of Capstone’s C200 engines. Expanding the operations at the UK facility is fundamental for the long-term support of Capstone’s established and growing sustainable energy fleet in the EMEA (Europe, Middle East & Africa) region, the company said.

Capstone UK facility Capstone Clean Energy has expanded its Integreted Remanufacturing Facility in Gosport, UK.

Located a short distance south of London and close to UK’s major shipping infrastructure, Capstone said the strategically located Gosport facility plays an increasingly important role in supporting the growth and expansion of the global microturbine fleet, as well as the rental program, which is a critical component of the company’s Energy as a Service (EaaS) business line. The construction of individual test cells and an increased grid export capacity agreement of 500 kW marks a significant milestone in the UK operation’s expanded capability to remanufacture C200 powerheads, in addition to remanufacturing the C200 recuperators.

From an original footprint of 3000 sq. ft. in 2009 to the current 19,000 sq. ft. expanded facility, the UK operation has evolved from a warehouse for aftermarket parts and hub for field support, to a fully integrated remanufacturing facility capable of serving the EMEA region’s future build requirements for Capstone’s flagship C200 engines. Taking recent possession of the adjacent building also marks the start of a trade-in program for a region with a legacy fleet to upgrade to the more efficient Signature Series product. The added floor space will accommodate a state-of-the-art training suite for in classroom and hands-on training for regional Distributors fulfilling their need to reduce travel costs while staying product-current and maintaining vital coverage.

“Continuing to invest in our UK operation is critical to Capstone’s key objectives to reduce and drive down freight dependency and offset manufacturing costs through our remanufacturing program,” said Darren Jamison, Capstone’s president and chief executive officer. “In parallel, we are improving response times for all our existing Distributor partners and growing our Energy as a Service (EaaS) business as we expand the global rental fleet.

“By adding complex remanufacturing processes, the UK facility now mirrors the Capstone US-based testing facilities. These capabilities will accelerate Capstone’s ability to provide parts and services to EMEA and improve future aftermarket margins.”

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

POWER SOURCING GUIDE

The trusted reference and buyer’s guide for 83 years

The original “desktop search engine,” guiding nearly 10,000 users in more than 90 countries it is the primary reference for specifications and details on all the components that go into engine systems.

Visit Now

CONNECT WITH THE TEAM
Becky Schultz Vice President of Content Tel: +1 480 408 9774 E-mail: [email protected]
Julian Buckley Editor Tel: +44 (0) 1892 784088 E-mail: [email protected]
Chad Elmore Managing Editor Tel: +1 262 754 4114 E-mail: [email protected]
Josh Kunz Power Progress Brand Manager Tel: +1 414 379 2672 E-mail: [email protected]
Roberta Prandi Power Progress International Brand Manager Tel: +39 334 6538183 E-mail: [email protected]
Simon Kelly Sales Manager Tel: +44 (0) 1892 786 223 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA